Q & A of the Day – Why determine exterior bulkhead light disconnection time during design stage?

Published: 12 January 2010 Category: Q&A

Our Voltimum Experts answer your questions on a daily basis in our Technical Expertise area. This one, concerning exterior bulkhead lighting, is answered by SELECT:

Q & A of the Day – Why determine exterior bulkhead light disconnection time during design stage?
Question: Why is the disconnection time of an exterior bulkhead light required during the design stage of an installation?

Answer: The disconnection time for a final circuit with a rating not exceeding 32A, used to supply an exterior bulkhead luminaire, is required to be 0.4 seconds - see BS7671: 2008 Regulation 411.3.2.2. Also see Table 41.1.

The designer is responsible for the installation and is required to ensure that these disconnection times are complied with. This will - in turn - ensure that the circuit will be disconnected from the supply in the event of a fault of negligible impedance on that circuit.