Authorities ZZ No Partner - Voltimum - Search | | Results of your search | Results 61 - 70 About 1888 For authorities brandid:NOPU (0.88 Seconds) | | | | In response to a BBC London report which questioned whether the London 2012 Aquatics Centre could be built the Olympic Delivery Authority today insisted that the construction is on track and will in fact start ahead of schedule this month. The BBC London | | http://www.voltimum.co.uk/news/10632/s/Aquatics-Centre-const[...] | | | | | The Olympic Delivery Authority (ODA) today published its Annual Report and Accounts for 2007 – 2008, following a year when the ODA has delivered virtually all, and exceeded some, of its 'Dig, Demolish, Design: Milestones to Beijing'. Publishing the | | http://www.voltimum.co.uk/news/10703/s/ODA-publishes-Annual-[...] | | | | | The Olympic Delivery Authority (ODA) today released new aerial photos of the venues in the Olympic Park as construction progresses ahead of schedule, to mark 'Four Years to Go' until the London 2012 Opening Ceremony on Sunday 27 July 2008. The photos | | http://www.voltimum.co.uk/news/10725/s/New-aerial-photos-of-[...] | | | | | to see local authorities given greater powers to set fines which could stop once | | http://www.voltimum.co.uk/news/10823/s/Overrunning-Utilities[...] | | | | | The contractors shortlisted to construct enhanced rowing and flatwater canoeing facilities for the London 2012 Games were announced by the Olympic Delivery Authority (ODA) today. The Rowing and Flatwater Canoeing events during the 2012 Olympic and Paralympic | | http://www.voltimum.co.uk/news/10873/s/Shortlist-announced-f[...] | | | | | New concept designs for a key piece of utilities infrastructure in the Olympic Park have been unveiled by the Olympic Delivery Authority (ODA) along with new photos showing the progress being made in constructing the new utilities networks. Concept | | http://www.voltimum.co.uk/news/10912/s/New-Olympic-Park-arch[...] | | | | | The Olympic Delivery Authority (ODA) has announced that the new entrance to Stratford International Station has been successfully lifted into place ready for the official opening in December for high speed domestic services. The new 36 metre bridge | | http://www.voltimum.co.uk/news/11474/s/Key-2012-transport-hu[...] | | | | | carbon buses within the reach of as many operators and local authorities as possible throughout | | http://www.voltimum.co.uk/news/12229/s/New-30-million-fund-f[...] | | | | | for the London 2012 Games, meaning the Olympic Delivery Authority (ODA) has now delivered all of the milestones[...] for elite events. The Centre will be owned, funded and managed by Lee Valley Regional Park Authority[...] experience for beginners.' | | http://www.voltimum.co.uk/news/12263/s/Construction-underway[...] | | | | | The Olympic Delivery Authority (ODA) has announced a new set of milestones, known as 'the big build: structures', to be achieved during the next phase of constructing the venues and infrastructure for the London 2012 Games. The ODA plans to deliver | | http://www.voltimum.co.uk/news/12377/s/Olympic-Park-venues-s[...] | | |
|
|
|