Future IEE - Voltimum - Search | | Results of your search | Results 31 - 40 About 2842 For future brandid:IEU (0.77 Seconds) | | | | This 5 page informative document discusses the installation of fire detection and alarm systems and how they can significantly reduce the risk of death or serious injury from fire. Written by John Ware... IN THE UK around 80% of all fire deaths and injuries | | http://www.voltimum.co.uk/news/5111/s/IEE-Insight-Fire-Alarm[...] | | | | | The Institution of Engineering and Technology will be exhibiting at Electrex 2006... The Institution publishes BS 7671 Requirements for Electrical Installations ('The IEE Wiring Regulations' 16th Edition including Amendments 1 & 2). In addition we produce | | http://www.voltimum.co.uk/news/5491/s/The-IET-Electrex-2006-[...] | | | | | The IEE's Technical Helpline receives numerous calls from contractors requesting information on the earthing and bonding requirements for hazardous locations. This article will give an overview of the hazards and problems encountered in those locations. 1. | | http://www.voltimum.co.uk/news/5505/s/Earthing-and-Bonding-i[...] | | | | | POWER FACTOR is the ratio between the useful (true) power (kW) to the total (apparent) power (kVA) consumed by an item of a.c. electrical equipment or a complete electrical installation. POWER FACTOR is a measure of how efficiently electrical power is converted | | http://www.voltimum.co.uk/news/5684/s/POWER-FACTOR-Correctio[...] | | | | | Most Portable equipment being used outdoors is supplied via a flexible cord fed from either a socketoutlet or a flexible cable/cord outlet plate. MOST PORTABLE equipment being used outdoors is supplied via a flexible cord fed from either a socketoutlet or | | http://www.voltimum.co.uk/news/5838/s/Permitted-forms-of-sup[...] | | | | | WHEN UNDERTAKING periodic inspections, contractors are often refused permission to shut down parts of an installation to carry out the required tests; the contractor duly records a limitation on the Periodic Inspection Report. The situation can go on for years | | http://www.voltimum.co.uk/news/5983/s/Periodic-inspection-of[...] | | | | | The original Approved Document P Electrical Safety came into effect on 1 January 2005. Its purpose, as with all other Approved Documents was to provide practical guidance for some of the more common building situations. Part P has changed Part P of Schedule | | http://www.voltimum.co.uk/news/6122/s/Part-P-2006-Edition.ht[...] | | | | | In this article we discuss Residual Current Device (RCD) operation, which can occur due to electrical faults both downstream and upstream of the device. An RCD, when correctly selected and installed, can provide protection against electric shock due to indirect | | http://www.voltimum.co.uk/news/6258/s/Understanding-RCDs.htm[...] | | | | | The Scottish Building Standards Agency (SBSA) was set up in June 2004 as an Executive Agency of the Scottish Executive to undertake the national functions related to the new building standards system set out in the Building (Scotland) Act 2003. THE SCOTTISH | | http://www.voltimum.co.uk/news/6411/s/Achieving-compliance-w[...] | | | | | THE IET's publication Electrical Maintenance has been completely revised and now includes up - to - date information on key areas including fire alarms, emergency lighting, risk assessment and legislation. Why perform maintenance? Maintenance is carried out | | http://www.voltimum.co.uk/news/6401/s/Electrical-Maintenance[...] | | |
|
|
|