Dimplex,installation,projects,information,dimplex,funding,approved,available,framework,supplier
Login
Register now!
home button  / News & Events
Manufacturers News
A selection of the latest news from leading Manufacturers
Browse by Manufacturer
Industry News
Trade Association and Industry Body News
Voltimum Newsletters
Voltimum Out and About

LCBP Phase 2: Increased Grants For Dimplex Heat Pumps

Dimplex
 
Approved ground source heat pump framework supplier Dimplex has welcomed the government’s announcement that grants of up to 50% are now available to the public sector for the installation of microgeneration technologies under the Low Carbon Buildings Programme Phase 2.

Plant Room - Scarning School
Plant Room - Scarning School
pixel

From 1st April 2008, the previous grant cap of 35% of system costs has been increased to 50% to make it even more attractive for schools, charities and other not-for-profit organisations to ‘go green’ and reduce their carbon footprint. For ground source heat pumps, the grants can contribute to the capital costs, the ground works and the commissioning of the system.

Chris Davis, head of renewables at Dimplex, comments: “The LCBP2 grants have been enormously popular with the public sector, with more than 60 projects to date receiving grant offers for funding for ground source heat pumps, and well over half of these specifying Dimplex equipment. This increase in the funding limit will make renewable heating solutions an even more affordable option for this sector.”

Since the beginning of the public sector stream of LCBP, Dimplex has helped a wide variety of organisations to access the grants. Successful projects include an extension at a primary school in Norfolk, a new build RNLI station on the Wirral, a ‘green energy’ technology trial at housing association properties in East Anglia and a visitor centre at the Pembrokeshire Coast National Park.

Dimplex has over 25 years’ experience of heat pumps in Europe and the UK and is one of only three companies appointed by BERR as a framework supplier of ground source heat pumps. To support its product range, it has an established national network of approved installer partners who have not only received extensive training on the Dimplex range, but are also Clearskies approved and have been installing heat pumps for a number of years so can bring a wealth of knowledge and expertise to any installation.

For a copy of an LCBP Phase 2 information pack or to discuss an LCBP heat pump project, call 0800 023 2243 or email lcbp@dimplex.co.uk. General information on the scheme is available at www.lowcarbonbuildingsphase2.org.uk.


 Related links
blue arrow pointing right  Dimplex
blue arrow pointing right  LCBP Heat Pumps

 Related contacts
Dimplex UK Ltd
Millbrook House
Grange Drive
Hedge End
Southampton
Hampshire
SO30 2DF
Tel: 0845 600 5111
Fax: 01489 773061
blue arrow pointing right   Email link to Dimplex

Source: dimplex
 Back

Related information

Related links
Related contacts

More News...

Dimplex Heat Pumps Flag The Way To Low Carbon Heating
Dimplex Case Study – Ascari Electric Boiler Provides Highland Heating
Dimplex Recognises Excellent Heat Pump Installers
Splash Out With Dimplex Aquabatix Showers
Dimplex Radio Frequency Control Goes 24/7
Dimplex Is Dedicated To Air Curtains
Renewable Solutions Expand In Hot Water
A Capital Choice - Dimplex DuoHeat Conquers Condensation In Edinburgh
Sports Personality Sharron Switches To Dimplex Fires