Q & A of the Day – At what point in this circuit should I do PSCC / PFC tests?

BookmarkThis 19.01.2012
ECA
 

This Question of the Day concerns a large electrical installation, plus prospective short circuit current (PSCC) and power factor correction (PFC) testing. It has been answered by the ECA:

LV panel feeding 10 AHUs.
LV panel feeding 10 AHUs.
pixel
This Q & A is one of thousands posted in our Technical Expertise area, and answered on a daily basis by our Voltimum Experts.

Question: I'm currently testing a large electrical installation that has an LV panel feeding ten air-handling units (AHUs) and a number of distribution boards. I understand that a prospective short circuit current (PSCC) test and a PFC test must be carried out at the origin and have completed these tests.

The problem I have is where else do I carry out the PSCC and PFC, and where would I record the results?

Am I right in saying that the tests in question should only be carried out again at the distribution boards, or would I need to find the values at the AHUs also?

If the main LV panel in question is thought of as a distribution board, surely the circuits feeding the AHUs will be similar to those from a distribution board?

Answer: The PSCC should be recorded at every switchgear/distribution location and recorded on the schedule of test results. The PFC is normally checked at the main intake, but can also be checked at the MCC and at main plant locations, and recorded on respective documentation.

To see many more Q & A in Voltimum UK's Experts Area, please click on the link:

www.voltimum.co.uk/consult.php?universe=consult.index.questions

 Back

 Related contacts
The Electrical Contractors' Association (ECA)
ECA Head Office, ESCA House,
34 Palace Court, London W2 4HY
Tel: 020 7313 4800
Fax: 020 7221 7344
Email: electricalcontractors@eca.co.uk
Web: www.eca.co.uk
blue arrow pointing right   ECA

 For latest electrical industry news, register for Voltimum's free newsletter.
Enter your email address here:
OK

Source: ECA & James Hunt

Related information

Related contacts

More News...

Q & A of the Day – Is this 1970s electrical installation still OK today?
Q & A of the Day - Please clarify how to connect this smoke alarm circuit?
Q & A of the Day - Should a wind turbine supply cable be earthed both ends?
Q & A of the Day – What testing is needed for this altered domestic kitchen circuit?
Q & A of the Day – Is this garage sub-distribution board earth CPC adequate?
Q & A of the Day – Are smoke detectors necessary for this toilet?
Q & A of the Day – Can I use this T&E cable as the sub-distribution board CPC?
Q & A of the Day – What connection for this circuit having an extra consumer unit?
Q & A of the Day – Can I use T&E cable for this sub-distribution board CPC?