Manufacturers’ News
A selection of the latest news from our Partners
Browse by Manufacturer
Industry News
Trade Association and Industry Body News
Pensions, Insurance & Business Services News
Wholesalers News
Voltimum Newsletters
Voltimum Features

Q & A of the Day - Can you tell me how to read this timer?

BookmarkThis 26.05.2011
Legrand
 

Our Voltimum Experts answer your questions on a daily basis in our Technical Expertise area. This Question of the Day, concerning, a timer used in a pump cycle,is answered by Legrand:

Legrand\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\'s MaxiRex QTT timer.
Legrand\\\\\\\\\\\\\\\'s MaxiRex QTT timer.
pixel
Question: I use a Legrand 497 35 MaxiRex QTT timer for the pump cycle on my septic tank. I would like to know how to read this dual timer which features 24 hour cycles - one for the pump and the other for the blower. There seems to be a problem with the pump cycle, as it doesn't always run properly.

I would really appreciate it if you can help me figure out how to read the timers.

Answer: I have attached instructions for the MaxiRex QTT time switch as requested.

Unfortunately, we have never had the MaxiRex two channel analogue versions in the UK range so we have very little knowledge regarding this product.

Having said that, it looks as though it is just two rings of pins, which you pull out to operate the timer for hours and ten minute intervals as required - please see the instructions attached.

Click below to download the attachment (PDF doc - 211kB file size).

To see many more Q & A in Voltimum UK's Experts Area, please click on the link:

www.voltimum.co.uk/consult.php?universe=consult.index.questions

 Back

 Downloadable attachment(s)
bluearrow  Legrand timer details - (PDF - 211kB).

 Related contacts
Legrand Electric Ltd.,
Great King Street North,
Birmingham B19 2LF
Tel: 0845 605 4333
Fax: 0845 605 4334
Email: legrand.sales@legrand.co.uk
Web: www.legrand.co.uk
blue arrow pointing right   Legrand Electric

 For latest electrical industry news, register for Voltimum's free newsletter.
Enter your email address here:
OK

Source: Legrand & James Hunt

Related information

Downloadable attachment(s)
Related contacts

More News...

Q & A of the Day – Can we control a lighting system from a two-gang switch in one back box?
Q & A of the Day - Should an electric shower isolating switch be fitted here?
Q & A of the Day – What is a lighting dimming system and what are the protocols used?
Q & A of the Day – Could this incoming supply prevent nuisance tripping?
Q & A of the Day – Where can I find this ammeter, or similar?
Q & A of the Day - Is cable separation required in trunking?
Q & A of the Day - Must I install an electric shower isolating switch?
Q & A of the Day - Will this wiring installation need trunking?
Q & A of the Day – How will the RCD part of a 230/240V RCBO be affected at 110/120V?