Manufacturers’ News
Industry News
Trade Association and Industry Body News
Pensions, Insurance & Business Services News
Wholesalers News
Voltimum Newsletters
VoltiNEWS Archive
VoltiTECH Archive
VoltiSPECIAL Archive
Voltimum Features

Cable sizing for safety and in accordance with the 17th Edition

BookmarkThis
Voltimum
 

Sizing cables correctly is essential to obtain best and most efficient use out of them, but it is also essential for the safety of people, electrical equipment, plant and buildings, because an undersized cable can easily overheat and, possibly, cause a fire. Oversized cables will be a waste of money. Yet the sizing of cables, while not hugely difficult, still requires some knowledge, so this VoltiTECH takes a look at the issues and provides an answer.

Newsletter
8 March 2010

Cable sizing for safety and in accordance with the 17th Edition


James Hunt
Managing Editor

Dear User

Sizing cables correctly is essential to obtain best and most efficient use out of them, but it is also essential for the safety of people, electrical equipment, plant and buildings, because an undersized cable can easily overheat and, possibly, cause a fire. Oversized cables will be a waste of money. Yet the sizing of cables, while not hugely difficult, still requires some knowledge, so this VoltiTECH takes a look at the issues and provides an answer.

Find out more about James' monthly report with his introductory article.

Important Note: VoltiBULLETIN becomes VoltiTECH!

We hope you like the new design of our monthly technical newsletter. We believe you will find it easier to extract the information you need as well as enjoy the new look and feel. You will still find the same rich technical content and, in many cases, the VoltiTECH will have CPD accreditation as it did in the past.

We have changed the name to VoltiTECH, to better reflect the themes and content of the newsletter and to bring us more into line with what we do in other Voltimum countries.

If you have any comments on the new design or on VoltiTECH in general we would love to hear them. Make your comment here.

Q & A

Why ignore voltage drop on the return/neutral cable?

Question: Reference methods 100 and 101 refer to twin & earth (T/E) cable installed within various thickness of insulation. What reference method should I use when cable is installed on top of any insulation?

Read the answerJames’ favourite Q&A’sView searchable archive


Get it right with Draka's online cable sizing calculator

Draka has launched an innovative cable sizing calculator on its website. Free to use, it can be accessed around the clock by registering on their website

Flexible conduit cable carrying capacity (wire fill) - Adaptaflex

Cable sizing is one matter, but there are also requirements in terms of cable carrying capacities (and more) for conduit, including flexible conduit, as Adaptaflex explains.



... this month's practical snag and its solution from the NICEIC

Two-way switching using the cpc

Circuit protective conductors of flat twin and earth cables should not be used for any other purposes.

A potentially dangerous snag is the use of the circuit protective conductor of a flat twin and earth cable as a live conductor in a two-way switching circuit. Danger may arise because an electrician working on the installation at a future date may, reasonably, make the assumption that the centre conductor is at Earth potential.

More on two-way switching using the CPC

This article is extracted from Snags and Solutions Part 1 or Part 2 published by the:



 Back

 Related contacts
3rd Floor
Bishops House,
25-29 Fulham High Street,
London
SW6 3JH
Telephone: 0207 751 3900
Fax: 0207 751 3901

 For latest electrical industry news, register for Voltimum's free newsletter.
Enter your email address here:
OK

Source: NICEIC

Registration

Related information

Related contacts

More News...

Surge Protection - Technical application and installation guides
17th Edition Amendment
The Latest in LED Development
The latest on solar PV systems, installation and operation
Building Regulations Part B - avoiding risk of fire spread through recessed lighting VoltiTECH June 2011
Energy Performance of Building Directives - VoltiTECH May 2011
VoltiTECH – New qualifications for supervising electricians. Review of VoltiTECH 2010
The latest advances in LED lighting
Solar photovoltaic (PV) systems and their installation