Our Voltimum Experts answer your questions on a daily basis in our Technical Expertise area. This Question of the Day, about sub-mains feeding distribution boards having both power and lighting loads, is answered by both SELECT and the ECA:

What volt drops when feeding light & power?
What volt drops when feeding light & power?
pixel
Question: What does BS7671: 2008 (the 17th Edition) require regarding volt drop percentage for a sub-main feeding a distribution board, which - in turn - serves both power and lighting?

For example: A 100A TPN supply to (say) a six-way TPN distribution board, which serves six mixed power circuits (5% volt drop and one lighting circuit 3% volt drop) - is the volt drop in the sub-main 5%, and then the final circuits power 5% lighting 3% or 3% overall?

Furthermore, if we were serving (say) six TPN distribution boards from an MCCB panel board, and each of these was serving a mix of lighting and power final circuits (as in a normal installation), then what is the volt drop in the sub-mains - is it 3% or 5%? If it is 3%, then the option for 5% is never going to be used, is it?

Answer by SELECT: In Appendix 12 of BS 7671: 2008, the volt drops given are between the origin of the installation and the load point - ie: the end of the final circuits. Where the installation has sub-mains, the volt drop split between sub-main and final circuits has to be determined by the designer of the installation.

Question 2: The NICEIC says that it would expect the overall volt drop to be no more than 3% from the origin, regardless of the designer's input, and that if the regulations state 3% from the origin, then in a court etc, the regulations would stand.

This means that the designer does not have any say on the 3/5% volt drop. If this is the case, then surely there is no point in having both 5% and 3% volt drop options as - in most cases - distribution from the origin of a supply will have both lighting and power circuits connected. This means that most installations will require more copper and cost more. Please clarify.

Answer by the ECA: The overall voltage drop limit is 3% (6.9V) single-phase, if the sub-main is feeding lighting circuits. The three-phase voltage drop in the sub-main should be worked out first. If (say) that came to 4.5V, the single-phase voltage at the distribution board would be 400V - 4.5V (395.5V) divided by root 3 = 228.3V. This, therefore, leaves a maximum voltage drop of 5.2V available for the final circuit.

To see many more Q & A in Voltimum UK's Experts Area, please click on the link:

www.voltimum.co.uk/consult.php?universe=consult.index.questions

 Back

 Related contacts
SELECT
Email: admin@select.org.uk
Web: www.select.org.uk
ECA
Email: electricalcontractors@eca.co.uk
Web: www.eca.co.uk
blue arrow pointing right   admin@select.org.uk

 For latest electrical industry news, register for Voltimum's free newsletter.
Enter your email address here:
OK

Source: SELECT, the ECA & James Hunt

Related information

Related contacts

More News...

Q & A of the Day – Can I run a separate supply to this machine socket-outlet?
Q & A of the Day – Must I buy new software for BS7671:2008 First Amendment?
Q & A of the Day – Should I use female bushes when mounting conduit box to metal trunking?
Q & A of the Day – Should I install an RCD to protect SWA cable at the house CU?
Q & A of the Day – What is the difference between City & Guilds 2391-10 and 2392 courses?
Q & A of the Day – Is there a problem with this client’s inspection report request?
Q & A of the Day – What is the right way to fit an SPD?
Q & A of the Day - Sockets by the seaside – what IP rating?
Q & A of the Day - What is required in terms of proximity of water/power supply cables?