Q & A of the Day – Do bonding requirements under PME extend throughout distribution sub-circuits?

12.03.2009
SELECT
 

Our Voltimum Experts answer your questions on a daily basis in our Technical Expertise area. This one, concerning a supply authority protective multiple earthing (PME) supply, is answered by SELECT:



IEE Guidance Note 8 'Earthing and Bonding'.
IEE Guidance Note 8 'Earthing and Bonding'.
pixel
Question: A supply authority 3ph+N PME supply feeds a main distribution board in a metering cubicle. This distribution board feeds a second subsidiary distribution board in a nearby building, which - in turn - feeds a third distribution board in a separate building.

Q1: Do the bonding requirements under PME conditions extend throughout the distribution sub-circuits?

Q2: Should the main bonding at each of the subsidiary distribution boards be made to a local MET, or should the bonding be back to the incoming supply MET?

Answer: The answer to Q1 is 'yes' - main protective bonding conductors should be applied in each building and the CPC of the sub main will be used as part of the main protective bonding system.

The answer to Q2 is that the main protective bonding (MPB) in each building would be made at the local MET. Note that the bond size should be in accordance with Table 54.8 of BS 7671: 2008, and be sized to suit the incoming supply, ie: not based on the size of the sub-main conductors.

Alternatively, a sub-main feeding a separate building could be altered at the incoming sub-main position to make the supply earthing system of a building a TT earthing system - a good source of information on this subject is IEE Guidance Note 8 'Earthing and Bonding'.

To see many more Q & A in Voltimum UK's Experts Area, please click on the link:

www.voltimum.co.uk/consult.php?universe=consult.index.questions


 Back

Enjoyed this article? Recommend it to your friends & colleagues

Looking for an answer? Use the search box below:

 Back

 Related contacts
SELECT
The Walled Garden, Bush Estate,
Midlothian, Scotland EH26 0SB
Tel: 0131 445 5577
Fax: 0131 445 5548
Email: admin@select.org.uk
Web: www.select.org.uk
blue arrow pointing right   SELECT

 For latest electrical industry news, register for Voltimum's free newsletter.
Enter your email address here:
OK

Source: SELECT & James Hunt

Question and Answers Article via Voltimum Our Voltimum Experts answer your questions on a daily basis in our Technical Expertise area. This one, concerning a supply authority protective multiple earthing (PME) supply, is answered by SELECT: by 12.03.2009

Related information

Related contacts

More News...

Q & A of the Day – Should this street lighting column have a separate earth?
Q & A of the Day – Should a community decorative tree’s lights be fed via RCD at 230V?
Q & A of the Day – Who should carry out the three-hour test on emergency lighting?
Q & A of the Day – Do these external CCTV and lighting supplies need surge protection?
Q & A of the Day – Must every tenant flat be fitted with emergency lighting?
Q & A of the Day – Is this lighting circuit R1 + R2 reading acceptable?
Q & A of the Day – This office has no socket outlet RCD protection – is this a Code 3?
Q & A of the Day – Is it OK to ignore the return/neutral cable voltage drop?
Q & A of the Day - What are protection requirements for sockets in hazardous areas?